Home   All Products > 641974-1

Power connector housing 

  • Image
  • Image

    The image is for reference only.

    MPN 641974-1
    Mfr. TE Connectivity
    Authorized Distributor
    Oneyac # A3w-641974-1
    Supplier Oneyac
    Unleaded/RoHs YES
    Description
    Universal MATE-N-LOK 12 Position Three Row Through-Hole Straight Header

    Specifications FAQ

    Description Details Operation
    Product Category Power connector housing
    Pin/Wire spacing 6.35 mm[.25 in]
    Position of digits 12
    Series Universal MATE-N-LOK
    Find the similar products:

    Q : Are the goods on the platform genuine?

    A : Please rest assured that the products sold in the Oneyac mall are all original and genuine products. We are the authorized dealer of electronic components of well-known brands both at home and abroad, and we guarantee the quality from the source.

    Q : Can you provide the original factory agent qualification certificate?

    A : Oneyac self-run selected brand has the original factory authorized agent qualification, and can provide the agent certificate.Part of the product data comes from partners (such as holder, future electronics, RS electronics), and we have carried out strict qualification examination for the products, with original factory labels and relevant bills for inspection.

    Q : Can I return it?

    A : Please carefully check the product model information before placing the order. If the order is wrongly ordered due to your own reasons, we will not accept the return or replacement requirements.If the product quantity is wrong, the model is inconsistent, and the product quality problem occurs, please be sure to keep the original packaging and label, and contact us within two weeks to apply for return.

    In Stock :  6,650

    Qty. Unit Price Ext. Price

    Full Reel (Order in multiples of 42)

    42+ $1.5422 $64.7724
    84+ $1.5422 $129.5448
    252+ $1.516 $382.032
    462+ $1.4783 $682.9746
    504+ $1.4274 $719.4096

    Unit Price:$

    Ext. Price:$

    When unpacking without original label and tray!
    MPQ 42 ETD HK 2~3 Weeks
    Min. 42 Mult. 1

    Special Note

    Production Date: 225 | JAN 2020 | CN; 25 | SEP 2018 | USA; 420 | MAR 2022 | USA; 420 | APR 2022 | USA; 420 | MAY 2022 | USA; 5140 | OCT 2022 | USA